{"id":166,"date":"2026-03-17T16:27:37","date_gmt":"2026-03-17T16:27:37","guid":{"rendered":"https:\/\/ammaya.in\/wavecity\/?p=166"},"modified":"2026-04-13T05:12:26","modified_gmt":"2026-04-13T05:12:26","slug":"wave-city-ghaziabad-construction-update-2026","status":"publish","type":"post","link":"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-construction-update-2026\/","title":{"rendered":"Wave City Construction Update 2026 \u2014 All Projects Status &#038; Progress"},"content":{"rendered":"\n<p style=\"font-size:13px;color:#777;margin:0 0 12px;padding:8px 12px;background:#f9f9f9;border-radius:3px;display:inline-block\">\u23f1 <strong>Last Updated:<\/strong> March 17, 2026 | Based on RERA UP filings, SquareYards data, and wavecity.in resident portal<\/p>\n\n\n\n<div style=\"background:#e3f2fd;border-left:5px solid #1565c0;padding:16px 20px;margin:0 0 24px;border-radius:4px;font-size:15px\"><strong>\ud83d\udccc Key Facts \u2014 Wave City Construction March 2026<\/strong><ul style=\"margin:10px 0 0;padding-left:22px;line-height:1.8\"><li>SKA Divine: 3 towers active, \u20b98,750\u2013\u20b99,000\/sqft (Q4 2025) \u2014 possession Aug 2029<\/li><li>Gaur NYC: 13 towers, 33 floors under construction \u2014 possession Aug 2029<\/li><li>County Jade Phase 1 &#038; 2: both RERA-registered June 2025 \u2014 possession Sep 2031<\/li><li>Phase 2 (Sectors 15\u201318): roads started, no utilities yet \u2014 DPR approved Aug 2024<\/li><li>GDA EWS\/LIG scheme Dec 2025: 2,986 units at \u20b94.49L with \u20b92.5L subsidy<\/li><\/ul><\/div>\n\n\n\n<p class=\"intro-para\">This is the <strong>Wave City Ghaziabad construction update for March 2026<\/strong>. We cover every active under-construction project, Phase 2 development status, new launches, registry progress, and what buyers should watch in the coming months. All data is sourced from RERA UP filings, SquareYards pricing data, and the wavecity.in resident portal.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Active Under-Construction Projects \u2014 March 2026<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr>ProjectDeveloperSectorsCurrent StatusRERA PossessionPrice (2026)<\/tr><\/thead><tbody><tr>SKA DivineSKA Group (PRASU BUILDCON LLP)Sector 1Active \u2014 3 towers, floors in progressAugust 2029\u20b98,750\u2013\u20b99,000\/sqft<\/tr><tr>Gaur NYC ResidencesGaursons IndiaSector 3Active \u2014 13 towers, 33 floorsAugust 2029\u20b97,500\u2013\u20b910,999\/sqft<\/tr><tr>County Jade Ph 1County Spaces Pvt. Ltd.Phase 1Construction startedSep 2031From \u20b92.3Cr<\/tr><tr>County Jade Ph 2County Spaces Pvt. Ltd.Phase 1Newly registered June 2025Sep 2031From \u20b92.3Cr<\/tr><tr>Karyan Avenue IVKaryan GroupSector 4Structure underway2029 (est.)\u20b920L\u2013\u20b91.2Cr<\/tr><tr>Karyan SquareKaryan GroupSector 2Under construction2028 (est.)\u20b920\u2013\u20b980L<\/tr><tr>Wave Veridia HeightsWave InfratechSector 1Near possession \u2014 offers being issued2025\u201326\u20b985L\u2013\u20b91.4Cr<\/tr><tr>Wave EligoWave InfratechPhase 1Final construction stages2025\u201326\u20b91.2Cr\u2013\u20b92Cr<\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">SKA Divine \u2014 Fastest Appreciating Project<\/h2>\n\n\n\n<p>Wave City Ghaziabad construction update for 2026 covers Phase 2 Sectors 15 to 18 development, Karyan Avenue IV commercial complex and active flat project completions. RERA: <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">UPRERAPRJ556045\/10\/2024<\/a><\/p>\n\n\n\n<p>SKA Divine launched in October 2024 at \u20b97,500\/sqft. By Q4 2025, prices had risen to \u20b98,750\u2013\u20b99,000\/sqft \u2014 a <strong>31.4% YOY appreciation<\/strong>, the highest in Wave City. Construction is active across all 3 towers (Alpha, Beta, Gamma). The project offers 3 BHK (1,855 sqft) and 4 BHK (2,962 sqft) apartments. Possession: August 2029.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Gaur NYC Residences \u2014 Largest Active Construction<\/h2>\n\n\n\n<p>RERA: <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">UPRERAPRJ188811\/08\/2024<\/a><\/p>\n\n\n\n<p>Gaur NYC is the most ambitious active project in Wave City \u2014 13 towers of 33 floors each, spread across 12 acres in Sector 3. Built by Gaursons India (65+ delivered projects, 60M+ sqft in NCR), it offers 3 BHK and 4 BHK apartments from 1,800\u20133,500 sqft. Possession: August 2029. Multiple floors in foundation and early-stage construction across different towers.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">County Jade \u2014 New RERA Registrations June 2025<\/h2>\n\n\n\n<p>Phase 1 RERA: <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">UPRERAPRJ267958\/06\/2025<\/a> | Phase 2 RERA: <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">UPRERAPRJ639770\/06\/2025<\/a><\/p>\n\n\n\n<p>County Jade refreshed both phases under new RERA registrations in June 2025. This is a super-premium project with only 4 units per floor \u2014 3\/4\/5 BHK apartments from 2,358\u20135,094 sqft, priced from \u20b92.3 crore. Possession September 2031. 13-acre site with 80% open space target.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 2 (Sectors 15\u201318) \u2014 Development Update March 2026<\/h2>\n\n\n\n<p>Following the <strong>GDA DPR approval in August 2024<\/strong>, Phase 2 development has formally begun. Ground reality as of March 2026:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Registry Status Update<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">New Launches &amp; Schemes \u2014 2025\u201326<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr>LaunchDeveloperDateDetails<\/tr><\/thead><tbody><tr>County Jade Phase 2County GroupJune 2025RERA UPRERAPRJ639770; 3\/4\/5 BHK from \u20b92.3Cr<\/tr><tr>GDA EWS\/LIG SchemeGDADecember 20252,986 units at \u20b94.49L total; \u20b92.5L subsidy<\/tr><tr>Gulshan Group Sector 1Gulshan GroupPre-launch 2026RERA pending; details TBC<\/tr><tr>SVP Group Phase 2SVP GroupPlanning 2026RERA not yet filed<\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What to Monitor in 2026<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">FAQs<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Which Wave City project is closest to possession in 2026?<\/h3>\n\n\n\n<p>Wave Veridia Heights and Wave Eligo are the closest to possession, with offers being issued in 2025\u201326. For under-construction new launches, SKA Divine and Gaur NYC are targeting August 2029.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is Phase 2 safe to buy in 2026?<\/h3>\n\n\n\n<p>Phase 2 plots are GDA-approved following the August 2024 DPR approval. However, there is no infrastructure yet in Phase 2 \u2014 no water, power, or roads beyond basic approach tracks. Phase 2 is suitable only for investors with a 5+ year horizon, not for immediate self-use.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Has SKA Divine started construction?<\/h3>\n\n\n\n<p>Yes. SKA Divine launched in October 2024 (RERA UPRERAPRJ556045) and construction is actively progressing across all 3 towers. Q4 2025 prices reached \u20b98,750\u2013\u20b99,000\/sqft, reflecting 31.4% YOY appreciation since launch.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Sources &amp; References<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><\/li>\n<\/ol>\n\n\n\n<p><strong>Also read:<\/strong> <a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-builders-comparison\/\">Wave City Builders 2026<\/a> | <a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-rera-verification\/\">RERA Verification Guide<\/a> | <a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-complete-guide\/\">Wave City Complete Guide 2026<\/a><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions \u2014 Wave City Construction 2026<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Which Wave City project will be completed first in 2026?<\/h3>\n\n\n\n<p>Among the major under-construction projects, <strong>SKA Arcadia<\/strong> is already operational with possession offered. <strong>Gaur NYC Residences<\/strong> (Sector 3, RERA: UPRERAPRJ188811) has a possession date of August 2029. <strong>County Jade Phase 1<\/strong> (RERA: UPRERAPRJ267958) targets September 2031. For ready-to-move options, <strong>Opulence Woods<\/strong> and <strong>Mantra Meadows<\/strong> in Sector 5 are already delivering.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is Wave City Phase 2 construction started?<\/h3>\n\n\n\n<p>Phase 2 (Sectors 15\u201318) received GDA DPR approval in August 2024, which was the formal green light for infrastructure development. As of March 2026, Sector 15 has basic approach roads and land demarcation underway. Internal utilities (water, sewage, power) are not yet functional in Phase 2. Residential construction by private builders is expected to begin in earnest through 2026\u20132027 as RERA registrations are filed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is the construction quality like in Wave City?<\/h3>\n\n\n\n<p>Construction quality varies by builder. Wave Infratech&#8217;s own projects (Eden, Dream Homes, Executive Floors) are mid-segment quality with standard RCC frame construction. Third-party builders like SKA Group, County Group, and Gaurs Group bring their own quality standards \u2014 generally good for the price range. For any under-construction project, verify the RERA registration at rera.up.nic.in and review the builder&#8217;s past delivery track record before booking.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How do I track my Wave City project construction progress?<\/h3>\n\n\n\n<p>The best way to track construction progress is: (1) Check your project&#8217;s RERA page at <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">rera.up.nic.in<\/a> \u2014 builders are required to upload quarterly progress reports. (2) Join your project&#8217;s resident WhatsApp group for real-time updates from other buyers. (3) Visit the site directly \u2014 Wave City allows buyer site visits on weekdays. (4) Contact your builder&#8217;s customer care for official possession timeline updates.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Are Wave City projects RERA-compliant?<\/h3>\n\n\n\n<p>All major projects in Wave City are individually registered under UP RERA. Each builder (SKA, Gaurs, County, Wave Infratech) has separate RERA registrations per project. Always verify the specific RERA number for your project at rera.up.nic.in \u2014 check that it is active (not expired), the possession date, and the promoter&#8217;s compliance history before making any payment.<\/p>\n\n\n\n<p><em>Last verified: March 2026. Construction statuses change \u2014 always verify RERA possession dates at rera.up.nic.in before any purchase decision.<\/em><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n\n<div style=\"background:linear-gradient(135deg,#1a1a2e 0%,#16213e 100%);border-radius:8px;padding:20px 24px;margin:28px 0;border-left:5px solid #c9a84c\">\n<p style=\"color:#c9a84c;font-size:13px;font-weight:700;margin:0 0 6px 0;letter-spacing:0.5px\">\ud83c\udfe1 LOOKING TO BUY A PLOT IN WAVE CITY?<\/p>\n<p style=\"color:#ffffff;font-size:16px;font-weight:700;margin:0 0 8px 0;line-height:1.4\">Get Expert Help \u2014 Plots from \u20b990,000\/sq yd.<\/p>\n<p style=\"color:#cccccc;font-size:14px;margin:0 0 14px 0;line-height:1.6\">Wave City Ghaziabad plots are available across Sectors 1\u20137 starting from \u20b990,000 per sq yard. Whether you want to buy, sell or invest \u2014 Ammaya Properties gives you verified pricing, free site visits.<\/p>\n<a href=\"https:\/\/ammaya.in\/wave-city-plots.html\" style=\"display:inline-block;background:#c9a84c;color:#1a1a2e;padding:10px 22px;border-radius:4px;font-weight:700;font-size:14px;text-decoration:none\">View Wave City Plots \u2192<\/a>\n<span style=\"display:inline-block;margin-left:14px;color:#aaaaaa;font-size:13px\">\ud83d\udcde +91-88264 17999 | Free Site Visit Included<\/span>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Related Articles<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Wave City Construction Update \u2014 What to Expect Next<\/h2>\n\n\n\n<p>The latest wave city construction update confirms that infrastructure development across all phases is progressing on schedule. Buyers tracking the wave city construction update will note that road widening, sewage treatment, and landscaping works are nearing completion in multiple sectors. The wave city construction update also highlights upcoming commercial deliveries that will boost connectivity and daily convenience for residents. For RERA project compliance status, verify at the <a href=\"https:\/\/up-rera.in\/\" target=\"_blank\" rel=\"nofollow noopener\">UP RERA portal<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Wave City Ghaziabad construction update March 2026 \u2014 SKA Divine, Gaur NYC, County Jade, Karyan Avenue IV construction progress, Phase 2 development status, new launches, and registry updates.<\/p>\n","protected":false},"author":1,"featured_media":218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[121],"tags":[],"class_list":["post-166","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-wave-city-ghaziabad"],"_links":{"self":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/comments?post=166"}],"version-history":[{"count":12,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/166\/revisions"}],"predecessor-version":[{"id":1078,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/166\/revisions\/1078"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/media\/218"}],"wp:attachment":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/media?parent=166"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/categories?post=166"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/tags?post=166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}