{"id":266,"date":"2026-03-19T15:19:41","date_gmt":"2026-03-19T15:19:41","guid":{"rendered":"https:\/\/ammaya.in\/wavecity\/?p=266"},"modified":"2026-04-13T05:12:23","modified_gmt":"2026-04-13T05:12:23","slug":"wave-city-ghaziabad-rera-verification","status":"publish","type":"post","link":"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-rera-verification\/","title":{"rendered":"Wave City Ghaziabad RERA Verification Guide 2026 \u2014 How to Check Any Project"},"content":{"rendered":"\n<p style=\"font-size:13px;color:#555;margin-bottom:8px\">\u23f1 <strong>Last Updated:<\/strong> March 2026 | RERA verification steps verified from UP RERA portal.<\/p>\n\n\n\n<div style=\"background:#f0f4ff;border-left:5px solid #1a1a2e;padding:16px 20px;margin:20px 0;border-radius:4px\"><strong>\u2705 Key Facts \u2014 Wave City RERA 2026<\/strong><ul style=\"margin:10px 0 0 0;padding-left:18px;font-size:14px\"><li>All major Wave City projects are individually RERA-registered<\/li><li>UP RERA portal: rera.up.nic.in \u2014 free to verify any project<\/li><li>Always check: registration status, possession date, promoter compliance<\/li><li>Never pay any advance without an active RERA number<\/li><li>Key Wave City RERA numbers listed below for quick reference<\/li><\/ul><\/div>\n\n\n\n<p>Wave city RERA verification is essential before booking any project \u2014 all major Wave City projects are registered and verifiable at the UP RERA portal at up-rera.in. RERA verification for Wave City Ghaziabad projects is essential before booking \u2014 all major projects are registered and verifiable at the UP RERA portal at up-rera.in. Every property purchase in Wave City should begin with a RERA verification \u2014 it takes 5 minutes and can save you from serious problems. UP RERA (Uttar Pradesh Real Estate Regulatory Authority) is the statutory body that regulates all real estate projects in the state. This guide shows you exactly how to verify any Wave City project on the RERA UP portal.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How to Verify a Wave City Project on UP RERA \u2014 Step by Step<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Go to:<\/strong> <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">rera.up.nic.in<\/a> \u2014 the official UP RERA portal<\/li>\n\n\n\n<li><strong>Click &#8220;Project Search&#8221;<\/strong> from the top navigation menu<\/li>\n\n\n\n<li><strong>Enter the RERA registration number<\/strong> (e.g., UPRERAPRJ556045 for SKA Divine) OR search by project name or promoter name<\/li>\n\n\n\n<li><strong>Review the project details page:<\/strong> Check registration status (Active \/ Expired \/ Revoked), registered completion\/possession date, promoter name and registration details<\/li>\n\n\n\n<li><strong>Check &#8220;Quarterly Progress Reports&#8221;<\/strong> \u2014 builders are required to upload construction progress reports every quarter. Missing reports are a red flag<\/li>\n\n\n\n<li><strong>Check &#8220;Complaints&#8221;<\/strong> tab \u2014 see if any complaints have been filed against the promoter or project<\/li>\n\n\n\n<li><strong>Download the registration certificate<\/strong> \u2014 this is the official proof of RERA compliance for your records<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Wave City RERA Numbers \u2014 Quick Reference 2026<\/h2>\n\n\n\n<div style=\"overflow-x:auto;margin:20px 0\"><table style=\"width:100%;border-collapse:collapse;font-size:14px;margin:16px 0\">\n<thead><tr><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Project<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Builder<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">RERA Number<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Type<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Possession<\/th><\/tr><\/thead>\n<tbody>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>SKA Divine<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">SKA Group<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">UPRERAPRJ556045<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">3\/4 BHK Flats<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Under construction<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>Gaur NYC Residences<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Gaurs Group<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">UPRERAPRJ188811<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">3\/4 BHK Flats<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Aug 2029<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>County Jade Phase 1<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">County Group<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">UPRERAPRJ267958<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">3\/4\/5 BHK Flats<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Sep 2031<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>County Jade Phase 2<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">County Group<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">UPRERAPRJ639770<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">3\/4\/5 BHK Flats<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Sep 2031<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>Wave Galleria<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Wave Infratech<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">UPRERAPRJ2830<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Commercial<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Operational<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>SKA Arcadia<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">SKA Group<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">UPRERAPRJ228610<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Commercial<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Operational<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>Karyan Square<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Karyan Group<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">UPRERAPRJ678096<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Commercial<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">2028<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>EWS\/LIG Phase 2<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">GDA \/ Wave<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">SECTOR-5-EWS\/LIG-PHASE-02<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Affordable Housing<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">TBC<\/td><\/tr>\n<\/tbody><\/table><\/div>\n\n\n\n<p><strong>Always verify these numbers directly at rera.up.nic.in<\/strong> \u2014 RERA registrations can expire or be updated. The numbers above are correct as of March 2026 but should be re-verified at time of purchase.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What to Check on the RERA Page \u2014 Red Flags &amp; Green Flags<\/h2>\n\n\n\n<div style=\"overflow-x:auto;margin:20px 0\"><table style=\"width:100%;border-collapse:collapse;font-size:14px;margin:16px 0\">\n<thead><tr><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">What to Check<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">\u2705 Green Flag<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">\u26a0\ufe0f Proceed with Caution<\/th><\/tr><\/thead>\n<tbody>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Registration status<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Active<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Expired or Revoked \u2014 do not proceed<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Possession date<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Realistic future date or already delivered<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Already passed without delivery<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Quarterly progress reports<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Reports uploaded regularly<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Multiple quarters missing<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Complaints filed<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Zero or resolved complaints<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Many open complaints<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Bank details<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Escrow account listed<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">No escrow account details<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Land title<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Developer owns or has clear lease<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Unclear ownership<\/td><\/tr>\n<\/tbody><\/table><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">RERA Rules Every Wave City Buyer Should Know<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>70% escrow rule:<\/strong> Builders must deposit 70% of all buyer payments in a dedicated escrow account \u2014 this money can only be used for construction of that specific project. This protects you from funds being diverted.<\/li>\n\n\n\n<li><strong>Possession delay compensation:<\/strong> If possession is delayed beyond the RERA-registered date, you are entitled to interest at SBI MCLR + 2% on your paid amount for every month of delay \u2014 or a full refund with interest.<\/li>\n\n\n\n<li><strong>No changes without consent:<\/strong> Builders cannot make material changes to approved plans without written consent from two-thirds of buyers.<\/li>\n\n\n\n<li><strong>Registered BBA mandatory:<\/strong> The Builder Buyer Agreement must be registered (not just stamped) to be enforceable under RERA.<\/li>\n\n\n\n<li><strong>File complaints at:<\/strong> <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">rera.up.nic.in<\/a> \u2192 Complaints section. RERA UP has a helpline: 0522-2237983.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions \u2014 Wave City RERA Verification<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Is Wave City Ghaziabad RERA registered?<\/h3>\n\n\n\n<p>Wave City Ghaziabad does not have a single RERA registration \u2014 instead, each individual project within the township has its own separate RERA registration. For example, SKA Divine (UPRERAPRJ556045), Gaur NYC (UPRERAPRJ188811), and County Jade Phase 1 (UPRERAPRJ267958) are each independently registered. Always verify the specific project you are buying into at rera.up.nic.in.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How do I check Wave City RERA on mobile?<\/h3>\n\n\n\n<p>Visit <a href=\"https:\/\/rera.up.nic.in\" target=\"_blank\" rel=\"noopener noreferrer nofollow\">rera.up.nic.in<\/a> on your mobile browser. The site is mobile-compatible. Go to Project Search, enter the RERA number (e.g., UPRERAPRJ556045), and the full project details including registration status, possession date, and developer information will be displayed.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What happens if a Wave City project&#8217;s RERA expires?<\/h3>\n\n\n\n<p>If a project&#8217;s RERA registration expires, the developer cannot legally sell new units, accept new bookings, or accept further payments from existing buyers. Buyers who have already paid have a right to a full refund with interest. An expired RERA is a serious red flag \u2014 do not proceed with any new payment if your project&#8217;s RERA is expired. File a complaint at rera.up.nic.in immediately.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can I file a RERA complaint against a Wave City builder?<\/h3>\n\n\n\n<p>Yes. Any buyer can file a complaint against a Wave City builder through the UP RERA portal at rera.up.nic.in. Common grounds for complaints include: possession delay beyond the registered date, changes to approved plans without consent, non-delivery of promised amenities, or refusal to refund after cancellation. RERA UP typically processes complaints within 60 days. You can file a complaint yourself without a lawyer.<\/p>\n\n\n\n<p><strong>Also read:<\/strong> <a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-registry-process\/\">Wave City Registry Process<\/a> | <a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-builders-comparison\/\">Wave City Builders Comparison<\/a> | <a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-complete-guide\/\">Wave City Complete Guide 2026<\/a> For full wave city RERA details on any specific project, visit up-rera.in and search by developer name or project name.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n\n<div style=\"background:linear-gradient(135deg,#1a1a2e 0%,#16213e 100%);border-radius:8px;padding:20px 24px;margin:28px 0;border-left:5px solid #c9a84c\">\n<p style=\"color:#c9a84c;font-size:13px;font-weight:700;margin:0 0 6px 0;letter-spacing:0.5px\">\ud83c\udfe1 LOOKING TO BUY A PLOT IN WAVE CITY?<\/p>\n<p style=\"color:#ffffff;font-size:16px;font-weight:700;margin:0 0 8px 0;line-height:1.4\">Get Expert Help \u2014 Plots from \u20b990,000\/sq yd.<\/p>\n<p style=\"color:#cccccc;font-size:14px;margin:0 0 14px 0;line-height:1.6\">Wave City Ghaziabad plots are available across Sectors 1\u20137 starting from \u20b990,000 per sq yard. Whether you want to buy, sell or invest \u2014 Ammaya Properties gives you verified pricing, free site visits.<\/p>\n<a href=\"https:\/\/ammaya.in\/wave-city-plots.html\" style=\"display:inline-block;background:#c9a84c;color:#1a1a2e;padding:10px 22px;border-radius:4px;font-weight:700;font-size:14px;text-decoration:none\">View Wave City Plots \u2192<\/a>\n<span style=\"display:inline-block;margin-left:14px;color:#aaaaaa;font-size:13px\">\ud83d\udcde +91-88264 17999 | Free Site Visit Included<\/span>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Related Articles<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-builders-comparison\/\">All Builders in Wave City Compared \u2014 RERA &amp; Track Record<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-complete-guide\/\">Wave City Ghaziabad Complete Guide 2026<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-registry-process\/\">Wave City Registry Process 2026<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-home-loan\/\">Wave City Home Loan Guide 2026<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-property-prices-2026\/\">Wave City Property Prices 2026<\/a><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Sources &amp; References<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>[1] UP RERA Portal \u2014 Official RERA registration database and complaint portal. rera.up.nic.in<\/li>\n\n\n\n<li>[2] RERA Act 2016 \u2014 Real Estate (Regulation and Development) Act \u2014 section on buyer rights and builder obligations.<\/li>\n\n\n\n<li>[3] 99acres \u2014 Wave City project listings with RERA numbers. 99acres.com<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>\u23f1 Last Updated: March 2026 | RERA verification steps verified from UP RERA portal. \u2705 Key Facts \u2014 Wave City RERA 2026\u2026<\/p>\n","protected":false},"author":1,"featured_media":332,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[121],"tags":[],"class_list":["post-266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-wave-city-ghaziabad"],"_links":{"self":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/comments?post=266"}],"version-history":[{"count":9,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/266\/revisions"}],"predecessor-version":[{"id":1075,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/266\/revisions\/1075"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/media\/332"}],"wp:attachment":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/media?parent=266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/categories?post=266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/tags?post=266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}