{"id":280,"date":"2026-03-19T15:36:21","date_gmt":"2026-03-19T15:36:21","guid":{"rendered":"https:\/\/ammaya.in\/wavecity\/?p=280"},"modified":"2026-04-13T05:12:19","modified_gmt":"2026-04-13T05:12:19","slug":"wave-city-phase-2-guide","status":"publish","type":"post","link":"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-phase-2-guide\/","title":{"rendered":"Wave City Phase 2 Guide 2026 \u2014 Sectors 15\u201318, Prices, Status &#038; Buyer Guide"},"content":{"rendered":"\n<p style=\"font-size:13px;color:#555;margin-bottom:8px\">\u23f1 <strong>Last Updated:<\/strong> March 2026 | Phase 2 status verified from GDA records and site visits.<\/p>\n\n\n\n<div style=\"background:#f0f4ff;border-left:5px solid #1a1a2e;padding:16px 20px;margin:20px 0;border-radius:4px\"><strong>\ud83c\udfd7\ufe0f Key Facts \u2014 Wave City Phase 2 (Sectors 15\u201318) 2026<\/strong><ul style=\"margin:10px 0 0 0;padding-left:18px;font-size:14px\"><li>GDA DPR approved August 2024 \u2014 Phase 2 development formally authorised<\/li><li>4 sectors: 15, 16, 17, 18 \u2014 over 5,000 additional plots<\/li><li>Plot prices: \u20b965,000\u2013\u20b990,000\/sqyd \u2014 30\u201350% cheaper than Phase 1<\/li><li>Plot sizes: 287\u2013485 sqyd (larger than typical Phase 1 sizes)<\/li><li>Current status (Mar 2026): Sector 15 has basic roads, others land-demarcated only<\/li><\/ul><\/div>\n\n\n\n<p>Wave City Phase 2 covers Sectors 15\u201318 and represents the township&#8217;s next growth chapter. Following the GDA DPR approval in August 2024, Phase 2 is now formally authorised for development \u2014 a milestone that unlocked 5,000+ stuck registrations and triggered renewed builder interest. This guide covers everything about Phase 2: current status, what&#8217;s happening sector by sector, prices, and what buyers need to know before committing.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What Is Wave City Phase 2?<\/h2>\n\n\n\n<p>Wave City&#8217;s 4,200-acre master plan is divided into two phases. Phase 1 covers Sectors 1\u20137 and is largely inhabited with 22,000+ residents. Phase 2 covers Sectors 15\u201318 \u2014 a large area deeper into the township beyond the inhabited Phase 1 sectors. The gap (Sectors 8\u201314) does not appear in any public sector maps and is not in active development.<\/p>\n\n\n\n<p>Phase 2 was sold to thousands of buyers between 2007\u20132015 but development was stalled for years due to the GDA DPR dispute. The August 2024 DPR approval resolved this \u2014 formally authorising GDA to fund and develop Phase 2 infrastructure (roads, utilities, drainage).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 2 Sector-by-Sector Status (March 2026)<\/h2>\n\n\n\n<div style=\"overflow-x:auto;margin:20px 0\"><table style=\"width:100%;border-collapse:collapse;font-size:14px;margin:16px 0\">\n<thead><tr><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Sector<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Plot Price (sqyd)<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Current Status<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Infrastructure<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Realistic Habitable Timeline<\/th><\/tr><\/thead>\n<tbody>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>Sector 15<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b965K\u2013\u20b990K\/sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Land demarcated, basic approach roads<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Roads: basic | Utilities: partial<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">2028\u20132029 earliest<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>Sector 16<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b955K\u2013\u20b975K\/sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Land demarcated<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Roads: minimal | Utilities: none<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">2029\u20132030<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>Sector 17<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b945K\u2013\u20b965K\/sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Early stage<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Roads: none | Utilities: none<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">2030+<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\"><strong>Sector 18<\/strong><\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b940K\u2013\u20b955K\/sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Earliest stage<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Roads: none | Utilities: none<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">2031+<\/td><\/tr>\n<\/tbody><\/table><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 2 Plot Sizes and Prices<\/h2>\n\n\n\n<div style=\"overflow-x:auto;margin:20px 0\"><table style=\"width:100%;border-collapse:collapse;font-size:14px;margin:16px 0\">\n<thead><tr><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Plot Size<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Sqft<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Sector 15 Price<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Sectors 16\u201318 Price<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Phase 1 Equivalent<\/th><\/tr><\/thead>\n<tbody>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">287 sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">2,583 sqft<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b91.87\u2013\u20b92.58 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b91.29\u2013\u20b91.72 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b92.58\u2013\u20b94.31 Cr<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">325 sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">2,925 sqft<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b92.11\u2013\u20b92.93 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b91.46\u2013\u20b91.95 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Phase 1 only<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">404 sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">3,636 sqft<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b92.63\u2013\u20b93.64 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b91.62\u2013\u20b92.22 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Phase 1 only<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">485 sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">4,365 sqft<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b93.15\u2013\u20b94.37 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b91.94\u2013\u20b92.67 Cr<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Phase 1 only<\/td><\/tr>\n<\/tbody><\/table><\/div>\n\n\n\n<p><strong>Note:<\/strong> Phase 2 plots are generally larger sizes (287 sqyd and above) compared to Phase 1 which also offers 135 and 194 sqyd plots. The price discount vs Phase 1 is 30\u201350% \u2014 reflecting the development timeline difference.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Who Is Building in Phase 2?<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Wave Infratech:<\/strong> The master developer continues to sell plots in Phase 2 sectors through their sales office.<\/li>\n\n\n\n<li><strong>SVP Group:<\/strong> Announced plans for a Phase 2 residential project \u2014 RERA registration expected through 2026.<\/li>\n\n\n\n<li><strong>Gulshan Group:<\/strong> Active in Phase 2 planning with a residential launch anticipated.<\/li>\n\n\n\n<li><strong>GDA:<\/strong> Responsible for township-level infrastructure (roads, drainage, utilities) as part of the August 2024 DPR framework.<\/li>\n<\/ul>\n\n\n\n<p>Before buying in Phase 2 from any private builder, always verify: (1) Active RERA registration at rera.up.nic.in, (2) GDA allotment letter for the specific plot, (3) Title chain is clean with no encumbrances.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Phase 2 vs Phase 1 \u2014 What You Get for Less Money<\/h2>\n\n\n\n<div style=\"overflow-x:auto;margin:20px 0\"><table style=\"width:100%;border-collapse:collapse;font-size:14px;margin:16px 0\">\n<thead><tr><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Factor<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Phase 1 (Sectors 1\u20137)<\/th><th style=\"background:#1a1a2e;color:#fff;padding:10px 12px;text-align:left;font-size:13px;font-weight:600\">Phase 2 (Sectors 15\u201318)<\/th><\/tr><\/thead>\n<tbody>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Price<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b975K\u2013\u20b91.8L\/sqyd<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">\u20b940K\u2013\u20b990K\/sqyd (30\u201350% less)<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Infrastructure<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Fully developed \u2014 roads, water, power, schools, malls<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Basic to none \u2014 developing<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Residents<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">22,000+ active community<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Zero residents<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Schools access<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">DPS, Hi-Tech World inside<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Travel to Phase 1 (5\u20138 km)<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Registry<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Fully operational<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Possible with valid RERA<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Home loans<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">All major banks active<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Available for RERA-registered plots<\/td><\/tr>\n<tr><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Self-construction<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Can start immediately<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Roads\/utilities needed first<\/td><\/tr>\n<tr style=\"background:#f9fafb\"><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">Investment horizon<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">3\u20135 years for next appreciation<\/td><td style=\"padding:9px 12px;border-bottom:1px solid #e5e7eb;vertical-align:top\">5\u20137 years minimum<\/td><\/tr>\n<\/tbody><\/table><\/div>\n\n\n\n<div style=\"background:#fff3e0;border-left:5px solid #e65100;padding:14px 18px;margin:24px 0;border-radius:4px;font-size:14px\"><strong>\u26a0\ufe0f Note:<\/strong> Phase 2 is in early development. All prices and timelines are indicative as of March 2026. Verify RERA status and current ground conditions before any purchase. This article is for informational purposes only and does not constitute investment advice.<\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions \u2014 Wave City Phase 2<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Is it safe to buy a plot in Wave City Phase 2 in 2026?<\/h3>\n\n\n\n<p>Buying in Wave City Phase 2 is legally safer now than at any time before the August 2024 GDA DPR approval. The DPR formally authorised development and enabled registry. That said, Phase 2 has zero to minimal physical infrastructure as of March 2026. It is suitable for investors with a 5\u20137 year horizon who are comfortable with an illiquid, no-income holding period. For end-users or buyers needing any near-term utility \u2014 Phase 1 remains the only practical choice.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What is the price of Phase 2 plots in Wave City?<\/h3>\n\n\n\n<p>Wave City Phase 2 plot prices range from approximately <strong>\u20b940,000\/sqyd (Sector 18) to \u20b990,000\/sqyd (Sector 15)<\/strong>. Sector 15 is the first and most developed Phase 2 sector \u2014 closest to Phase 1. Sectors 17 and 18 are cheaper but have the furthest infrastructure development timeline. Plot sizes in Phase 2 are generally 287 sqyd and above \u2014 smaller 135\/194 sqyd sizes are mainly Phase 1 inventory.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">When will Wave City Phase 2 be ready to live in?<\/h3>\n\n\n\n<p>Based on current development pace, the earliest any Phase 2 sector could reach habitable conditions is <strong>2028\u20132029 for Sector 15<\/strong>. Sectors 16\u201318 are realistically 2029\u20132031+. For context, Phase 1 took approximately 10 years from approval to reach its current infrastructure maturity. Phase 2 benefits from the DPR framework funding, which should accelerate infrastructure delivery vs Phase 1&#8217;s timeline.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can I get a home loan for a Phase 2 plot?<\/h3>\n\n\n\n<p>Yes \u2014 following the GDA DPR approval in August 2024, Phase 2 plots with valid RERA registrations are eligible for home loans from major banks. SBI and HDFC have been most active in Phase 2 lending. The key requirement is an <strong>active RERA registration for the specific plot\/project<\/strong> at rera.up.nic.in. Always verify this before approaching any bank.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n\n<div style=\"background:linear-gradient(135deg,#1a1a2e 0%,#16213e 100%);border-radius:8px;padding:20px 24px;margin:28px 0;border-left:5px solid #c9a84c\">\n<p style=\"color:#c9a84c;font-size:13px;font-weight:700;margin:0 0 6px 0;letter-spacing:0.5px\">\ud83c\udfe1 LOOKING TO BUY A PLOT IN WAVE CITY?<\/p>\n<p style=\"color:#ffffff;font-size:16px;font-weight:700;margin:0 0 8px 0;line-height:1.4\">Get Expert Help \u2014 Plots from \u20b990,000\/sq yd.<\/p>\n<p style=\"color:#cccccc;font-size:14px;margin:0 0 14px 0;line-height:1.6\">Wave City Ghaziabad plots are available across Sectors 1\u20137 starting from \u20b990,000 per sq yard. Whether you want to buy, sell or invest \u2014 Ammaya Properties gives you verified pricing, free site visits.<\/p>\n<a href=\"https:\/\/ammaya.in\/wave-city-plots.html\" style=\"display:inline-block;background:#c9a84c;color:#1a1a2e;padding:10px 22px;border-radius:4px;font-weight:700;font-size:14px;text-decoration:none\">View Wave City Plots \u2192<\/a>\n<span style=\"display:inline-block;margin-left:14px;color:#aaaaaa;font-size:13px\">\ud83d\udcde +91-88264 17999 | Free Site Visit Included<\/span>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\">Related Articles<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-sectors-guide\/\">All 18 Sectors of Wave City Explained<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-gda-dpr-approval-2024\/\">Wave City GDA DPR Approval 2024<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-investment-guide\/\">Wave City Investment Guide 2026<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-plot-sizes\/\">Wave City Plot Sizes 2026<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/ammaya.in\/blog\/wave-city-ghaziabad\/wave-city-ghaziabad-registry-process\/\">Wave City Registry Process 2026<\/a><\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\">Sources &amp; References<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>[1] GDA \u2014 DPR Approval August 2024, Phase 2 development framework. gda.up.nic.in<\/li>\n\n\n\n<li>[2] UP RERA Portal \u2014 Phase 2 project registrations. rera.up.nic.in<\/li>\n\n\n\n<li>[3] 99acres \u2014 Wave City Phase 2 pricing and development data. 99acres.com<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>\u23f1 Last Updated: March 2026 | Phase 2 status verified from GDA records and site visits. \ud83c\udfd7\ufe0f Key Facts \u2014 Wave City\u2026<\/p>\n","protected":false},"author":1,"featured_media":308,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[121],"tags":[],"class_list":["post-280","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-wave-city-ghaziabad"],"_links":{"self":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/comments?post=280"}],"version-history":[{"count":5,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/280\/revisions"}],"predecessor-version":[{"id":1059,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/posts\/280\/revisions\/1059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/media\/308"}],"wp:attachment":[{"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/media?parent=280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/categories?post=280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ammaya.in\/blog\/wp-json\/wp\/v2\/tags?post=280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}